• Skip to content
  • Jump to main navigation and login

Nav view search

Navigation

Search

You are here: Home
  • Artículos
    • Marina Mercante
      • Mercados - Fletes - Cotizaciones
      • Navieras
      • Energia, Combustibles
    • Seguridad marítima
      • Accidentes
      • Pirateria
      • Salvamento maritimo
    • Construccion Naval
    • General
    • Enseñanzas náuticas, formación, cursos
    • Historia de la Marina Civil
    • Puertos
      • El Musel
    • Derecho marítimo
      • Ley de Navegación
    • Meteorología y Oceanografía
    • Marina de Recreo y Deportiva
    • Pesca

Búsqueda is closed


Los 20 + vistos is closed

  • VASCO DA GAMA: ROUTE FROM PORTUGAL TO INDIA (1497)
  • The top 10 cruise holidays in Spain
  • EL ORIGEN DE LAS HABANERAS.-
  • ¿POR QUÉ AEMC SE OPONE A LA TITULACIÓN DE INGENIER0 NÁUTICO?
  • SASEMAR y la ofensa a sus capitanes
  • Cason. Las fabulaciones sobre el accidente del buque "Cason"
  • HACIENDA SOMOS TODOS.- EL TRÁFICO DE CONTENEDORES EN EL MUSEL CAYÓ UN 73% EN LOS ÚLTIMOS SEIS AÑOS
  • ACCIDENTES MARÍTIMOS FEBRERO 2005
  • LA MILITARIZACION DE LA MARINA CIVIL Y EL CASO PORVENIR I.-
  • ENTREVISTA A Jose Antonio Madiedo .- "TRAS LA AMPLIACIÓN, EL MUSEL NO SERÁ EL PUERTO QUE ASTURIAS NECESITA"
  • No. 1 shipbuilder to talk wages
  • CRISTOBAL COLON ERA CAPITAN DE LA MARINA CIVIL
  • Cristóbal Colón era capitán de la Marina Civil
  • EL MUSEL.- LA REGASIFICADORA
  • LA ASOCIACIÓN PROFESIONAL DE MARINOS DE LA ADMINISTRACIÓN MARÍTIMA DENUNCIA LA ACTUACION DEL DIRECTOR GENERAL DE LA MARINA MERCANTE, D. RAFAEL RODRIGUEZ VALERO
  • SE DEBERÍA CREAR LA CÁTEDRA DE HISTORIA DE LA MARINA CIVIL
  • LA CARA OCULTA DEL “COSTA CONCORDIA”
  • EL MUSEL Y SU GRAN PROYECTO
  • EL MUSELAZO.- UN INFORME DE LA UE CUESTIONA EL PACTO CON HC(hidrocantábrico) PARA EL SUMINISTRO DE PIEDRA A EL MUSEL
  • EL NACIMIENTO DE LA ESCUELA SUPERIOR DE LA MARINA CIVIL DE GIJÓN

Maritime Labour Convention : 20 years of advancing social dialogue and decent work at sea

  • Print
  • Email
Details
Category: Enseñanzas náuticas, formación, cursos
Published on Thursday, 26 February 2026 07:02
Written by Administrator2
Hits: 188

 

23 February 2026

 
 
Nautilus general secretary Mark Dickinson (centre) acted as spokesman for the seafarers' group in his role as ITF seafarers' section vice chair during the MLC amendment negotiations in Geneva in April 2025. Image: ILO

Joint statement from the International Labour Organization, the International Chamber of Shipping, and International Transport Workers' Federation on the 20th anniversary of the Maritime Labour Convention 

On the 20th anniversary of the Maritime Labour Convention (MLC), 2006, we jointly reaffirm our commitment to the principles and protections it embodies and recognise the profound impact it has had on seafarers and on global shipping.  

The MLC consolidated and modernised around 70 maritime labour instruments into a single, comprehensive international framework. In doing so, it established enforceable minimum standards for wages, hours of

Seguir leyendo

Reefer Engineer Essentials: System Operation Tips

  • Print
  • Email
Details
Category: Enseñanzas náuticas, formación, cursos
Published on Saturday, 14 February 2026 07:39
Written by Administrator2
Hits: 260

marine public

Refrigeration cycles, equipment tricks and troubleshooting tactics


QUICK ANSWER: REEFER REFRIGERATION ESSENTIALS

The Four-Stage Refrigeration Cycle:
• Compression – raises vapor pressure from low to high, enabling heat rejection
• Condensation – converts high-pressure vapor to liquid by removing heat
• Expansion – drops liquid pressure to enable evaporation at low temperature
• Evaporation – absorbs heat from cargo space as liquid becomes vapor

Critical System Components:
► Compressor: Reciprocating (most common) or screw type for vapor compression
► Condenser: Shell-and-tube water-cooled or air-cooled with fans for heat rejection
► Expansion Valve: Thermostatic type maintains 5°C superheat at evaporator outlet
► Evaporator: Tube coil absorbs cargo space heat through refrigerant evaporation
► Receiver: Stores liquid refrigerant between condenser and expansion valve

Superheat and Sub-Cooling Basics:
• Superheat ensures only vapor enters compressor (prevents liquid damage)
• Normal superheat range: 5°C to 10°C at evaporator outlet
• Sub-cooling ensures 100% liquid flow to expansion valve (prevents vapor formation)
• Occurs in condenser and liquid line before expansion

Seguir leyendo

Buque Escuela "Christian Radich"

  • Print
  • Email
Details
Category: Enseñanzas náuticas, formación, cursos
Published on Friday, 13 February 2026 21:57
Written by Administrator2
Hits: 238

 

Buque escuela de la Marina Cvil de Noruega

History

 

Christian Radich was built by Framnæs Mech. Yard in 1937. She was built as a sail training ship: the orlops (dormitories) had capacity for berthing 80-90 students (maximum 80 today after renovation), a large galley for learning to cook, carpentry training, and earlier there was also a machine shop on board (where the galley is now) for the training of engineers. The purpose of the training ship was to train sailors. Sailing-ships were the usual vessels around the turn of the century and that is why the sailing ships continued as a school ship later on.

Christian Radich

 

Even though the initiator to build Christian Radich is often referred to as “Captain”, his profession was general manager

Seguir leyendo

OOW Cargo Watch Duties on Bulk Carriers Explained

  • Print
  • Email
Details
Category: Enseñanzas náuticas, formación, cursos
Published on Wednesday, 11 February 2026 14:44
Written by Administrator2
Hits: 288

Essential supervision tasks for safe cargo operations and hold management

 

QUICK ANSWER: OOW MAIN DUTIES DURING BULK CARRIER CARGO OPERATIONS

Hold Preparation and Inspection:
• Inspect all cargo spaces for cleanliness and readiness before loading
• Test bilge pump suctions ensuring proper function
• Check hold lighting throughout all compartments
• Verify dunnage correctly laid if required for cargo type
• Examine spar ceiling and limber boards condition
• Confirm ventilation systems operational
• Check drainage and scupper systems clear

Hatch Cover Operations:
► Open hatch covers when weather permits following safe procedures
► Secure covers in correct stowed position with locking devices
► Ensure stowage bay clear before opening operations
► Monitor eccentric wheels, locking pins and securing arrangements
► Close and secure hatches at end of operations
► Lock all hatch access points after completion

Cargo Monitoring and Supervision:
• Regular checking holds loaded or discharged correctly
• Note cargo parcels being loaded for

Seguir leyendo

Page 1759 of 2769

  • Start
  • Prev
  • 1754
  • 1755
  • 1756
  • 1757
  • 1758
  • 1759
  • 1760
  • 1761
  • 1762
  • 1763
  • Next
  • End

© Copyright 2001 - 2026 Asociación Española de la Marina Civil